August 28th. All that recent carpentry is for new forms being built at the perimeter of the deck.
|

Great Blue Heron (Ardea herodius) as I headed back east through the marsh.
|

Female Wood Duck (Aix sponsa) at the left. Two males at the right (that I hadn't noticed until I started editing pictures).
|

Rosy Maple Moth (Dryocampa rubicunda) in an Evening Primrose (Oenorthera biennis) flower where they often spend the day.
|

Mid-afternoon, back at Old Colchester Road. A section of the new form giving fitting fits to the workers.
|

That sticking out bit shouldn't matter.
|

Friday, so no more significant work before Monday.
|

Great Blue Heron (Ardea herodius) hanging out by a Wood Duck house.
|

The usual two male Wood Ducks (Aix sponsa). Not sure where the female was.
|

Other than staging a couple more panels, looks like no more work after I left yesterday afternoon.
|

People have wondered about the red caps on these sections of rebar. They're to prevent a worker being impaled should they fall on one (e.g., if climbing down from above).
|

August 31st. Male Wood Duck (Aix sponsa).
|

Closed Gentian (Gentiana andrewsii).
|

Great Blue Heron (Ardea herodius), as usual.
|

Young female and male Wood Ducks.
|

Roughly 3:00 P.M. and the last form section is going up.
|

Last screws.
|

Rebar on the outside of the forms so there will be further cement work there eventually.
|

That task complete.
|

Now some heavy lifting. Big concrete blocks lowered towards the base of the wall...
|

...and stacked two high.
|

Another stack to the left. (I think there were 4 or 5 stacks in all.)
|

Partridge-pea (Chamaecrista fasciculata) right by the construction site.
|

September 2nd. After rain yesterday, today the crew are adding rebar and wire to the surface that will be covered in concrete soon.
|

There must be thousands of joints that will be clipped together.
|

Black Tooth fungus (Phellodon niger) growing beside the trail.
|

Grey Garden Slug (Deroceras reticulatum).
|

Brief stop around 3 P.M. I was surprised to find them adding another layer of rebar.
|

Ah, the big cement blocks offer a place to stand just outside the area to be poured.
|

A lot of time spent studying the plans. Rain coming tonight. Guessing they'll get a late start at work tomorrow.
|
|