November 16th. Around 2 P.M. and the second coat of asphalt was already complete.
|

Marking the middle where paving would first be to the right, then the left of that line.
|

Spraying what I think must be a bonding agent between coats.
|

Ready for paving.
|

Moving the paver into position.
|

The red truck kept the paving machine stocked with asphalt.
|

It took several truckloads of asphalt for each strip.
|

Waiting for the next truckload...
|

...and here it is.
|

Arm at center makes an even edge to the new asphalt.
|

Roller followed up quickly.
|

Ready for more asphalt.
|

Smoothing out the junction with the old pavement...
|

...and tamping it down.
|

Back after 3 P.M. Paving complete.
|

Storm drains level with the paving.
|

Digger spreading the gravel for what will be a small parking area adjacent to the trail crossing.
|

Tamping down the gravel.
|

That's it. The paving is done and looks great.
|

November 17th.Gravel work on the edges. When flattened, this will be the former space for several cars of trail users.
|

I've been wondering what they plan to do for the exposed backs of the storm drains.
|

About done for the day.
|

November 18th. Ah Hah! They've been making curbs to match the storm drain height.
|

On the far side, they've been smoothing out the banks down to the stream.
|

Gravel behind the curbs.
|

Back to the trail, heading east. Heavy frost in the shaded areas.
|

Back out around 3 P.M. when work was about done for the day. Worker is coating the concrete to protect it through the winter.
|

Looking east, trail at the right; parking area to the left.
|

Dirt beyond trap rock. This will be seeded soon.
|

Hmm, somenative wildflower seeds could be a nice addition.
|

The project has come a long way.
|
|